Home / Pool Construction

Pool Construction

Gunite and vinyl inground pools engineered for Long Island soil, water table and winters. Design, permits and construction under one roof.

Overview

Gunite for freedom of shape, vinyl for value

Gunite gives you any geometry you can draw: tanning ledges, integrated spas, vanishing edges, raised walls with sheer descents. Vinyl gives you a clean, fast, budget-friendly build with a smooth surface that swimmers love. We install both, and we will tell you plainly which one fits your yard and budget.

  • Soil, grade and water table evaluated before design is finalized
  • 3D renderings and a fixed written proposal before you commit
  • Permits, surveys and inspections handled by our office
  • Engineered steel, plumbing and hydrostatic relief for coastal lots
  • Automation, heaters, salt systems and LED lighting installed in-house
Rebar and shotcrete shell of a new gunite pool

What is included

Design & engineering

Site analysis, 3D renderings, structural detailing and an equipment plan sized to your pool volume.

Excavation & shell

Layout, dig, steel, plumbing and either a sprayed gunite shell or a steel-wall vinyl system with a concrete collar.

Finishes

Waterline tile, coping in bluestone or travertine, plaster, quartz or pebble interior, or the liner pattern you choose.

Decking & hardscape

Paver, travertine or stamped concrete decking, retaining walls, outdoor kitchens and fire features.

Equipment & automation

Variable speed pumps, cartridge filtration, heaters, salt chlorination and phone-based control.

Startup & handoff

Fill, chemistry balancing, equipment tuning and a walkthrough so you run the pool with confidence.

Questions

Pool Construction FAQ

How much does a new pool cost?

Vinyl liner pools generally start near $65,000 installed and gunite pools generally start near $95,000. Access, water table, decking and hardscape drive the final figure.

How long does construction take?

Eight to twelve weeks of on-site work after permits are issued. Town permitting typically adds two to eight weeks.

Can you build on a small or hard-to-access yard?

Yes. We use compact excavators and conveyor systems for tight side yards, and we will confirm access on the first visit.

What about a high water table?

Common on the South Shore. We plan dewatering during excavation and install hydrostatic relief so the shell stays put.

Do you offer financing?

We work with several pool lending partners and can send options with your proposal.

Request your free estimate

We reply the same business day.

Thanks. We have your request and will call you shortly.

By submitting you agree to be contacted about your project. No spam.

Ready to talk about your pool?

Free on-site estimate anywhere in Nassau or Suffolk County.